How to Run an Hour-by-Hour Production Board on a Factory TV
Plan vs actual, every hour, where the line can see it.
An hour-by-hour production board shows, for each hour of a shift, the planned output, the actual output and the reason for any gap. To run one on a factory TV, keep four columns, update actuals every hour from a shared sheet or dashboard, use large red/green cues, and review misses at the next tier meeting.
An hour-by-hour production board is a line-side display that shows, for every hour of the shift, what the line planned to make, what it actually made and why any gap happened. Putting it on a TV instead of a whiteboard means it updates from your data, stays readable from across the floor and looks the same on every line. The trick is keeping it simple enough that operators act on it during the shift, not after.
What is an hour-by-hour production board?
It is one of the simplest tools in lean visual management. Fabrico describes it as the place where each hour's planned output, actual output and the reason for any gap are recorded as the shift unfolds. The point is speed: a supervisor who sees a 20-unit miss at 9 a.m. can fix a jam or call maintenance before it turns into a lost shift. A weekly report only tells you what already went wrong.
Paper and dry-erase versions work, but they rely on someone remembering to write the number, and they are hard to read from more than a few feet away. A TV fixes both problems if the data behind it updates on its own or with one quick entry per hour.
What columns should the board show?
Keep it to four or five columns. Every extra column makes the numbers smaller.
| Column | What goes in it | Who fills it |
|---|---|---|
| Hour | 6–7, 7–8, 8–9 and so on, with breaks marked | Set once per shift pattern |
| Plan | Target units for that hour, adjusted for breaks and changeovers | Planner or supervisor |
| Actual | Good units made that hour | Operator, team lead or machine count |
| Gap / reason | Short cause: "material late," "jam at station 3," "changeover ran long" | Team lead |
| Running total | Cumulative plan vs actual for the shift | Calculated |
The gap-reason column is the one that matters most. Numbers tell you something went wrong. The reason tells you what to fix, and it gives you a list to work through at the daily meeting.
How do you get live numbers onto the TV?
You have three realistic options, from simplest to most automated:
- A shared spreadsheet. Build the board in Google Sheets or Excel with plan values filled in and a cell per hour for actuals. The team lead types the count at the top of each hour from a tablet or a nearby PC. Formulas color the row green or red and update the running total. The TV shows the sheet.
- A BI dashboard. If counts already land in a database or MES export, a Power BI report can pull them and show the same table without anyone typing.
- Machine counters. Some plants feed PLC or sensor counts into a dashboard. That is the most accurate, but it needs IT and controls help, so start with the spreadsheet and upgrade later.
With Display NOW for manufacturing, the spreadsheet or Power BI dashboard plays on the line-side screen, and you can check the remote preview from the office to confirm every line's board is showing the right shift.
How should the board look so people actually read it?
- Big numerals. Anyone walking the aisle should read plan and actual without stopping. If you can't read it from the forklift lane, the font is too small.
- Color for status only. Green when the hour met plan, red when it missed, gray for hours not yet run. Avoid decorative colors that compete.
- Current hour highlighted. A border or bold row tells people where to look.
- One line per screen. Combining three lines on one TV shrinks everything. Use one screen per line, or rotate lines only in a supervisor area.
- No rotation on the line-side screen. If the board disappears for 30 seconds every minute to show a safety slide, people stop checking it. Put safety content on a separate screen.
Where should you mount the screen?
Mount it where the team stands, not where managers walk. The end of the line, above the pack-out station or next to the andon light usually works. Keep it high enough to clear carts and forklifts but low enough to read without craning. If the area is dusty or wet, put the TV in a protective enclosure and run the player from a dry spot.
What routine keeps the board honest?
The board is only as good as the habit around it. A simple routine:
- Start of shift: the supervisor confirms plan values for the shift, including breaks and planned changeovers.
- Every hour: the team lead enters actuals and a reason for any miss within five minutes of the hour.
- Two misses in a row: escalate. Call maintenance, quality or the material handler right then.
- Daily tier meeting: review the top three gap reasons from the previous day and assign one fix.
- Weekly: check whether the plan values themselves are realistic. A board that is red every hour usually means the target is wrong, not the team.
Use calendar scheduling for shift changes. Display NOW lets you schedule a different board for first, second and third shift, and priority rules let a planned shutdown notice override the board when needed.
What mistakes make teams ignore the board?
- Using it to blame. If a red hour leads to a lecture, people will stop writing honest reasons.
- Stale numbers. A board that still shows yesterday's data at 8 a.m. teaches everyone to ignore it.
- Too many metrics. OEE, scrap, safety days and attendance on one screen turn the board into a dashboard nobody reads. Keep those on other factory floor screens.
- No response. If gap reasons pile up and nothing changes, the team learns the board is for show.
What do you need to get started?
A commercial or business-grade TV, a player, a spreadsheet template and a signage account. The Display NOW Edge Player is in stock and ships in 1–2 business days, and our team handles remote device support. You can test the whole setup on one line with the free 14-day trial, no credit card required. See plans and pricing when you're ready to add more lines.
Hour-by-hour board FAQ
Is an hour-by-hour board the same as an andon board?
Not quite. An andon signals a problem the moment it happens, often with a light or call. The hour-by-hour board tracks output against plan over the shift. Many plants use both, side by side.
Should actuals be entered manually or automatically?
Automatic counts are more accurate, but manual entry once an hour is a fine place to start. Writing the number and the reason gets the team thinking about the gap, and that is the point of the board.
How do you set the hourly plan?
Most teams divide the shift target by available hours, then subtract time for breaks, startup and planned changeovers. If your plant uses takt time, base the plan on takt.
Can one screen show multiple lines?
It can, but readability suffers. Use one screen per line at line side, and a combined view in the supervisor's office or break area.
- Track plan, actual, gap reason and response for each hour.
- Feed the TV from a shared sheet or Power BI, not a slideshow.
- Make misses readable from 30 feet with color and big numerals.
- Review gap reasons daily or the board becomes wallpaper.